Ground-Up Construction Analyzer
Model land equity, hard and soft costs, contingency, draw interest, reserve needs, and completed-value outcomes.
Live results · No email required · Print and compare
Results
Illustrative estimate from the inputs shown. Not a rate quote, approval, or commitment to lend.
Land, construction, financing, and other costs
Loan ÷ projected completed value
On total basis of $798,187
Project cost
Capital stack
Exit scenarios
| Completed value | Net after costs | Profit | Return on basis |
|---|---|---|---|
| $2,340,000 -10% | $2,223,000 | $34,813 | 4.4% |
| $2,470,000 -5% | $2,346,500 | $158,313 | 19.8% |
| $2,600,000 0% | $2,470,000 | $281,813 | 35.3% |
| $2,860,000 +10% | $2,717,000 | $528,813 | 66.3% |
Sensitivity: profit to hard-cost overruns
Construction overruns and completed-value movement applied together.
| Completed value ↓ / Hard costs → | -5% cost | 0% cost | +5% cost | +10% cost |
|---|---|---|---|---|
| -10% | $98,716 | $34,813 | -$29,091 | -$92,911 |
| -5% | $222,216 | $158,313 | $94,409 | $30,589 |
| 0% | $345,716 | $281,813 | $217,909 | $154,089 |
| +10% | $592,716 | $528,813 | $464,909 | $401,089 |
Methods and formulas used
Total project cost = land + hard costs with contingency + soft costs + points + draw interest + other costs.
LTC = loan ÷ total project cost, including land.
Cash contribution = total project cost + land liens paid off − loan drawn − land equity.
Draw interest = monthly outstanding balance × annual rate ÷ 12, summed across the build.
SageFin Capital is a commercial finance brokerage and provides illustrative tools only. Results are estimates based on the inputs you provide and do not constitute a rate quote, pre-approval, credit decision, or commitment to lend. Lender eligibility, program availability, and terms are determined by the lender through a separate review.